S01 PETHow it works
From a line survey to bales you can prove.
We start with one line and one stream, and we measure your line before we change it, so every result has a baseline. Robots go on the belt only after your safety sign-off.
S02 HDPEProcess
Five stations, about twelve weeks.
01Week 1
Survey
Walk the line with your team, film the belt and audit a shift of residue.
02Weeks 2–4
Shadow
Cameras and Percepta watch the belt and count what each position misses. Nothing moves.
03Weeks 3–6
Teach
Models tune to your stream; Synthos covers rare and new items.
04Weeks 6–10
Pick
A two-robot Graspix cell picks one stream, beside your pickers.
05Weeks 8–12
Prove
Puritix measures every bale; you decide to expand, extend or stop.
S03 ALUResponsibilities
Who does what.
| Step | Your team | Sortona |
|---|---|---|
| Survey | Shares bale specs, line drawings and a residue sample | Films the belt, audits residue, proposes positions |
| Shadow | Provides power, network and a mounting point | Installs cameras and an edge computer; runs Percepta |
| Teach | Confirms material classes and buyer limits | Tunes models; fills gaps with Synthos scenes |
| Pick | Runs safety sign-off and owns the cell | Installs and commissions the Graspix cell |
| Prove | Sets purity limits; reviews results | Measures every bale with Puritix; reports weekly |
S04 OCCCopilot
Ask the line what happened.
Shift leads ask questions in plain language.
The operator copilot reads quality records, line signals and pick logs, explains what changed, and proposes fixes. Nothing changes on the line until a person approves it.
Operator copilot · example
Why did PET purity drop on line 2 after lunch?
Puritix measured PET bale purity falling from 96% to 91% between 13:10 and 14:30. Percepta saw a rise in black PP tubs in the inbound load from the same hour, and Graspix zone 2 was picking a share of them as PET because their labels match. I have queued 2,000 Synthos scenes of black PP tubs for the next model update and suggested a confidence threshold change for zone 2. Both wait for your shift lead to approve.
Illustrative. The copilot explains and proposes; changes to the line wait for a person to approve them.
S05 GLASSOutcomes
What you get at the end.
Measured
A baseline
What each position on your line catches and misses today, by material.
Cell
A running cell
One stream picked by robots, with every pick and bale on record.
Choice
A decision
Expand to more streams, extend the trial, or stop. Each is a fine outcome.
S06 FILMQuestions
Plain answers.
How much of our team's time does this take?
Plan for a maintenance lead part-time during install, a shift lead for weekly reviews, and your safety lead for the sign-off.
Do we need to stop the line to install?
Cameras go in during a planned maintenance window. The robot cell needs a longer shutdown, which we plan with you.
What if the cell underperforms?
You will know, because the shadow phase gives a baseline and Puritix measures every bale. You can stop at any step.
S07 RecoveredNext step
Show us the line that loses the most.
Send us a few minutes of belt video and your bale specs. We walk the line with your team, mark where value leaves in the residue, and show what a first sort cell would pick, with every number labelled as an estimate until it is measured on your belt.